Congratulations

you are one step closer to solar power

We have some helpful hints to move your project along faster. Please review the following information.

First, please inform your salesperson if you have any Homeowners Association applications that you need us to take care of.

ComEd Customers: Please confirm that ComEd is your current energy supplier. If you currently get your energy from a Residential Energy Supplier (RES), please make the switch back to ComEd ASAP. This will allow for easy interconnection processing, as well as a guaranteed slot in ComEd’s net metering program.

What to Expect Next

1 /

Confirm your loan & introduce the team

Upon signing your contract, you will have received a request for signature from Enerbank to confirm your loan amount. Once signed, we will have then introduced you to your project managers and construction team, and you will be set up on our project management system Basecamp.

2 /

Surveyor & Electrical Review

Within a week of signing off on your financing, you should hear from your PM to get a site survey scheduled. Our surveyor will review the roof (interior and exterior) and electrical system in person. They also review your electrical panel to ensure it is up to code and has space for the solar breakers.  (This is a great time to get any repairs or upgrades done since all of these repairs also receive the 26% Federal tax credit).

3 /

Physical Layout for your approval

Using the information gathered at the site survey, a physical layout is completed for your review and approval.  This process ensures you have the production you want, and meets any and all aesthetic, and fire code requirements. (Typically gets completed within 2 weeks of site visit)

4 /

Financing Finalized

After layout is approved, Sun Badger will countersign your Enerbank documents so that we have the financing ready to go for material order. This will officially start the clock on your loan. We apply for interconnection and net metering with the electric company.

5 /

Electric Company & City Approvals

Now, the fun part – WAITING. We wait for the electric company to approve interconnection and net metering, and we wait for your city to approve the construction permit. Some cities take 2 days, some take 6 weeks. The utility takes approximately 4 weeks to grant all approvals.

6 /

Set an Install Date

Once all approvals come through, we order your materials and set an install date. Material can be delivered within 2 days, an install date can be set within 3 weeks. Barring any unforeseen circumstances, your install will take 1-4 days (depending on system size).

7 /

Construction is complete

Once construction is complete, you will need to sign off on the second round of Enerbank financing documents. This happens the day the crew is off the roof. We schedule a final inspection with the city. This typically happens within 1 week.

8 /

Final Inspection & Permission to Operate

Final inspection passes and we submit the inspection ticket to ComEd. ComEd has 10 business days to give us the official Permission To Operate (this means we can turn it on!). Typically it takes 6 business days maximum, but technically can take 10. We get Permission To Operate from ComEd, and we let you know how to flip the switch to ON.

9 /

Configure your SolarEdge Monitoring Portal

So, your system is on! And you want proof. We configure your SolarEdge Monitoring portal (this can’t happen until the system is actually on). You will receive an email directly from SolarEdge, allowing you to create a login to view your system’s production information.

10 /

Closeout Meeting

You let your Project Manager know when you are available for a 10 minute closeout call – they will walk you through SolarEdge Monitoring if you need, answer any lingering questions you may have, and get the details from you about how the process went.

Wisconsin State Incentives – SRECs:

Your Focus On Energy incentive application is submitted within 1 week of system power-up. Please allow 8-10 weeks for the payment to be processed.

Have more questions?

Reach out to your Sun Badger Project Manager. They’re always available via email, text, phone call, or Basecamp.

312.405.0797 carley@sunbadger.com

Sun Badger Solar Newsletter

SIGN UP FOR OUR NEWSLETTER!

Join our mailing list to receive exclusive offers, the latest Solar news and innovations from our team to your email inbox.

You have Successfully Subscribed!